E02D-E02D00904
  E02D 11/00 - E02D 37/00  

SECTION E – FIXED CONSTRUCTIONS


E 02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING


E 02 DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES  [6]


Notes

(1)This subclass covers underground structures made by foundation engineering, i.e. involving disturbance of the ground surface.  [6]

(2)This subclass does not cover underground spaces, made by underground mining methods only, i.e. not involving disturbance of the ground surface, which are covered by subclass E21D.  [6]


Subclass Index

INVESTIGATING, IMPROVING OR PRESERVING FOUNDATION SOIL OR ROCK 

E02D 1/00, E02D 3/00 

STRUCTURAL ELEMENTS AND TECHNIQUES THEREFOR 

Structural elements 

E02D 5/00 

Placing; removing; placing and removing; accessories 

E02D 7/00; E02D 9/00; E02D 11/00; E02D 13/00 

HANDLING MATERIALS 

E02D 15/00 

EXCAVATIONS, MAKING EMBANKMENTS 

E02D 17/00 

KEEPING DRY FOUNDATION SITES 

E02D 19/00 

CAISSONS 

E02D 23/00, E02D 25/00 

FOUNDATIONS AS SUBSTRUCTURES; UNDERGROUND OR UNDERWATER STRUCTURES, RETAINING WALLS 

E02D 27/00; E02D 29/00 

PROTECTING, TESTING, STRAIGHTENING, LIFTING, REPAIRING 

E02D 31/00 to E02D 37/00 



1/

00Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00)

1/

02.before construction work

1/

04..Sampling of soil

1/

06..Sampling of ground water

1/

08.after finishing the foundation structure


3/

00Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/20; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/10; setting rock anchoring bolts E21D)

3/

02.Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28)  [3]

3/

026..by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers (rollers for soil working in agriculture A01B 29/00; rollers for road paving, such rollers usable also for compacting soil E01C 19/23)  [3]

3/

032...Trench rollers  [3]

3/

039...Slope rollers  [3]

3/

046..by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/30, for consolidating concrete in general E04G 21/06)  [3]

3/

054...involving penetration of the soil, e.g. vibroflotation  [3]

3/

061...Tampers with directly acting explosion chambers (pile drivers with explosion chambers E02D 7/12)  [3]

3/

068...Vibrating apparatus operating with systems involving reciprocating masses (E02D 3/054, E02D 3/061 take precedence)  [3]

3/

074...Vibrating apparatus operating with systems involving rotary unbalanced masses (E02D 3/054 takes precedence)  [3]

3/

08..by inserting stones or lost bodies, e.g. compaction piles (sand drains for soil compaction E02D 3/10; stressing soil while forming foundations E02D 27/28)

3/

10..by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains (E02D 3/11 takes precedence; soil-penetrating vibrators with auxiliary watering E02D 3/054; drainage of soil in general E02B 11/00)  [3]

3/

11.by thermal, electrical or electro-chemical means (freezing soil for interrupting passage of underground water E02D 19/14)  [3]

3/

115..by freezing  [3]

3/

12.Consolidating by placing solidifying or pore-filling substances in the soil (making piles E02D 5/46; soil-conditioning or soil-stabilising materials C09K 17/00)


5/

00Bulkheads, piles, or other structural elements specially adapted to foundation engineering (engineering elements in general F16)

5/

02.Sheet piles or sheet pile bulkheads

5/

03..Prefabricated parts

5/

04...made of steel

5/

06....Fitted piles or other elements specially adapted for closing gaps between two sheet piles or between two walls of sheet piles

5/

08....Locking forms; Edge joints; Pile crossings; Branch pieces

5/

10...made of concrete or reinforced concrete

5/

12....Locking forms; Edge joints; Pile crossings; Branch pieces

5/

14..Sealing joints between adjacent piles (sealing joints not restricted to foundation piles E04B 1/68)

5/

16..Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly

5/

18.Bulkheads or similar walls made solely of concrete in situ

5/

20.Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

5/

22.Piles (sheet piles E02D 5/02)

5/

24..Prefabricated piles

5/

26...made of timber with or without reinforcement; Means affording protection against spoiling of the wood (cases E02D 5/60; impregnating agents B27K 3/16); Self-cleaning of piles placed in water

5/

28...made of steel

5/

30...made of concrete or reinforced concrete or made of steel and concrete

5/

32...with arrangements for setting in position by fluid jets

5/

34..Concrete or concrete-like piles cast in position

5/

36...making without use of mould-pipes or other moulds

5/

38...making by use of mould-pipes or other moulds

5/

40....in open water

5/

42....by making use of pressure liquid or pressure gas for compacting the concrete

5/

44....with enlarged footing or enlargements at the bottom of the pile

5/

46...making in situ by forcing bonding agents into gravel fillings or the soil (consolidating soil in general E02D 3/12)

5/

48..Piles varying in construction along their length

5/

50..Piles comprising both precast concrete portions and concrete portions cast in situ

5/

52..Piles composed of separable parts, e.g. telescopic tubes

5/

54..Piles with prefabricated supports or anchoring parts; Anchoring piles

5/

56..Screw piles

5/

58..Prestressed concrete piles

5/

60..Piles with protecting cases

5/

62..Compacting the soil at the footing or in a casing by forcing cement or like material through tubes

5/

64..Repairing piles

5/

66.Mould-pipes or other moulds

5/

68..for making bulkheads

5/

70..for making sheet piles

5/

72.Pile shoes

5/

74.Means for anchoring structural elements or bulkheads (anchoring piles E02D 5/54)

5/

76..Anchorings for bulkheads or sections thereof

5/

80..Ground anchors


7/

00Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds (for both placing and removing E02D 11/00)

7/

02.Placing by driving

7/

04..Hand pile-drivers

7/

06..Power-driven drivers

7/

08...Drop drivers with free-falling hammer

7/

10...with pressure-operated hammer

7/

12...Drivers with explosion chambers

7/

14...Components for drivers

7/

16....Scaffolds for drivers

7/

18.Placing by vibrating

7/

20.Placing by pressure or pulling power

7/

22.Placing by screwing down

7/

24.Placing by using fluid jets

7/

26.Placing by using several means simultaneously

7/

28.Placing of hollow piles or mould-pipes by means arranged inside the piles or pipes

7/

30..by driving cores


9/

00Removing sheet pile bulkheads, piles, mould-pipes, or other moulds (for both placing and removing E02D 11/00)

9/

02.by withdrawing

9/

04.by cutting-off under water

   E02D 11/00 - E02D 37/00  
 

Copyright SciTecLibrary


To add the material   Terms of registration   Terms for placing technology, inventions, productions & other informations   Price list

You always can buy kamagra online now!
A few occasions when such websites were giving away Free Viagra Trial as real pills intended for door-to-door.