Russian version

Home page

Search:

For contact - E-mail


Technology Database
Technology Database    Prospecting, production activity and waste handling of minerals    Petroleum-gas machinery HYDROMECHANICAL SLOT PERFORATION

HYDROMECHANICAL SLOT PERFORATION

Secondary completion technology with 60, 73 mm diameter tubing run perforator geophysically linked to cross-section allows forming large-length longitudinal split with roll-on disk (all-point loading metal plastic deformation principle) in the required casing interval, and washing a cavity with fluid jetting in the cement ring and rock.

Major advantages of the technology:

  • higher hydrodynamic quality of formation exposing due to exposing with a slot of all fluid-conducting channels;
  • specific exposure area is for 80-90% higher than at jet perforating with maintained casing strength;
  • penetration radius is 2 times higher compared to jet perforating;
  • no impacting casing during perforation;
  • no impacting cement stone outside casing upper and lower perforating interval;
  • allows for selective exposing of only producing interlayers without breaking barriers between them;
  • allows exposing formation with oil or any other working fluid;
  • allows for reperforation with simultaneous treatment of transition zone;
  • the operation can be performed at any time of day and does not require turning-off electric energy supply;
  • if necessary, a well can be produced through perforator till the next workover;
  • costs is not higher than for jet perforation method;
  • allows effectively removing outside-casing cross-flows;
  • increases well intake capacity before emergency cementing/fracturing.

Perforator designed is protected by RF patent.

Parameters of slot perforator PGMS 102*,114,140,146,168,178*

Max outside diameter, mm

80…150

Guaranteed total slot length for 1 run, m

10

Slot width, mm

10…12

Penetration radius for hydromonitor treatment, m

0.2…0.3

Max. hole curvature, degrees

45

Weight of the tool, kg

35…75

Duration of hydromonitor treatment perforation of 1 m, min

5…30

Quantity of well-op. on 1 tool, more then

5

* in design study

 

 

Source: SciTecLibrary.ru
Publishing date: December 27, 2000

To make an inquiry on the technology you are interested in

Back

 

Copyright © SciTecLibrary


To add the material   Terms of registration   Terms for placing technology, inventions, productions & other informations   Price list




Rambler's Top100 Rambler's Top100 ßíäåêñ öèòèðîâàíèÿ